Skip to content
SYS_TIME: 00:00:00.00//LATENCY: 24MS//NODES: 142//BTC_HASH: 000000000000//TZ: UTC//
X: -100Y: -100
All dispatches
// ENTITY_RECORD  //  TYPE: ORGANIZATION

KivuWatt

// OVERVIEW

Nexor's April 2026 dispatch references KivuWatt as a commercial methane extraction operation drawing gas from Lake Kivu and converting it to electricity, currently running at 26 MW with reported plans to expand capacity to 100 MW. The broadcast notes a significant caveat: according to one of KivuWatt's own limnologists, extraction at present rates falls short of meaningfully reducing the risk of a limnic eruption in the lake, framing the project's safety contribution as limited relative to the scale of the hazard the dispatch describes.

// 1 APPEARANCES IN THE ARCHIVE

// RELATED ENTITIES